Out Of The Box Engineering
Out Of The Box Engineering
Residential Services

Residential Permit & Engineering Services

Permit drawings, Engineering coordination, Zoning review and application support for Residential projects across Ontario.

02

Deck Permit in Ontario

Deck or Garage permit drawings and application support for new decks, replacement decks, guards, stairs, footings, and structural changes across Ontario, ON

Deck Permit Design and Engineering in Ontario

Deck Permit Ontario

Smart Planning. Safe Design. Smoother Permits.

Pre-Requisite Before Deck Design

Smart Deck Design Starts with the Right Review

Before designing your deck, we review zoning, setbacks, lot coverage, property lines, easements, grade, and existing structures to confirm the proposed location works.

We also assess footings, beams, joists, posts, ledger connections, stairs, guards, and structural loads to create a safe, coordinated design.

With accurate site dimensions, deck height, and intended use confirmed early, Out of the Box Engineering helps deliver a complete deck permit package and reduce revisions during City review.

Permit Documentation

Document Checklist

A

Property Details, Site Plan

B

Existing Deck & Proposed Deck Plan

C

Deck Size, Elevation, Section, Deck Height above grade

D

Framing & stairs details

E

Setbacks, Lot coverage & Zoning Compliance

Our Process

Steps for DECK PERMIT @ Out of The Box Engineering

01

Zoning & Lot Coverage Review

Review zoning and lot coverage requirements.

02

Structural Framing & Footings check

Review structural framing and footing requirements.

03

Guards, Stairs & Railings Rules

Review guards, stairs and railing requirements.

04

Permit Drawings & Details

Prepare permit drawings and construction details.

05

City Submission, Review & Inspection Support

Support submission, review and inspection.

03

Home Addition Permit

Architectural Design, Zoning Review & Permit Drawings for rear, side, and second-storey home additions across Ontario, including City submission and permit support.

Home Addition Planning

Plan Your Home Addition Right

Before designing a home addition, we review zoning, setbacks, lot coverage, building height, floor area, and projections to confirm what can be built.

We also assess the existing home’s foundation, roof, drainage, floor levels, and structural connections to create a practical, permit-ready design.

Early planning helps reduce redesigns, permit delays, and unexpected costs.

Home Addition Permit Design in Ontario

Home Addition Permit

Design. Plan. Permit. Build.

Permit Documentation

Home Addition Drawings and Documents Typically Required

Site Plan, zoning
Height, setback & Lot coverage information
Existing & Projected Floor plan
Elevations & Building details
Foundation, Framing & Construction snapshot

Home Addition / Adding Dwelling or Secondary Suite Process

Above are our steps for the Home Addition/ Adding Dwelling or Secondary suite process.

04

Walkout Basement / Separate Entrance Permit

Permit drawings and application support for basement below grade entrance, walkouts, separate entrances, exterior stairs, underpinning-adjacent work in Ontario.

Why to Add a Separate Basement Entrance to Your Home?

A separate basement entrance can do more than improve access—it can increase your home’s functionality, privacy, and long-term value.

Separate Basement Entrance and Walkout Basement

Key Benefits of a Separate Basement Entrance

01
Potential Rental Income

Create a more independent basement space that can support rental opportunities, subject to applicable zoning and building requirements.

02
Increased Property Value

A well-designed, permitted entrance can enhance your home’s functionality and appeal to future buyers.

03
Enhanced Privacy

Provide a separate access point for basement occupants, guests, or family members while maintaining privacy throughout the home.

04
More Usable Living Space

Make your basement more accessible and functional for an additional living area, recreation space, home office, or other permitted use.

05
Improved Accessibility

A dedicated entrance can provide easier access to the basement for family members, guests, or occupants.

06
Greater Flexibility

A separate entrance gives your basement greater potential to adapt to changing family, lifestyle, or income needs.

07
Long-Term Investment

When properly designed and permitted, a separate basement entrance can add practical value today and potentially contribute to your property’s future marketability.

Make Your Basement Work Better for You

A separate basement entrance is more than an additional door—it can unlock the potential of your basement space. From improved privacy and accessibility to added flexibility and potential rental opportunities, it can be a smart home improvement when planned and permitted correctly.

Planning a basement entrance? Start with the right design, zoning, and permit requirements.

Basement Walkout Permit Process

01

ZONING & SITE REVIEW

Side-yard & zoning requirements

02

STRUCTURAL REVIEW

Engineering & stamped structural details

03

EXTERIOR DETAILS

Stairs • Guards • Drainage

04

PERMIT PACKAGE

Drawings & construction notes

05

CITY SUBMISSION

Submission & review support

05

Load Bearing Wall Removal Permit

Permit drawings and structural coordination for removing or altering load-bearing walls, beams, posts, and related interior structural changes in Ontario

Common City Review Issues

Existing conditions don’t match the proposed drawings

Wall type or load path is not clearly identified

Beam, post, or footing details are missing

Required engineer-stamped structural details are incomplete

Permit drawings lack sufficient construction details

Knocking down walls can add to a home’s resale value by enlarging rooms, opening up spaces and improving sightlines. The easiest thing about load-bearing wall removal is usually taking down the wall itself. The greater challenges come from the planning, preparation and especially the installation of the new support beam.

This guide reviews how to remove a load-bearing wall, how to install a load-bearing wall beam and the costs for load-bearing wall removal.

FAQ – LOAD BEARING WALL REMOVAL

1) Is it essential to get permit for Load Bearing wall removal?

Yes. Removing or modifying a load-bearing wall typically requires a building permit, as it can alter the building’s structural load path and requires proper structural design and review.

2) How to identify a wall is load bearing?

A site review and assessment of existing drawings, floor and roof framing, beams, posts, and foundation support may be required to determine whether the wall is load-bearing and how it supports the structure. We offer site measurement and though review prior starting the design.

3) How to remove a load-bearing wall at my project?

Removing a load-bearing wall typically requires structural engineering to design the beam, posts, supports, and revised load path. Requirements may vary based on the existing structure and the municipality.

4) What are the common city Review issues

Wall type or load path is not properly confirmed, Beam, post or footing info are missing, Incomplete Structural information stamped by Engineer, site is not suitable for change planned, insufficient construction details in permit package.

5) What are common requirements to apply load bearing wall removal process?

Permit requirements vary by project and municipality. Depending on the existing structure and proposed work, the permit package may include floor plans, structural details, sections, construction notes, and engineer-stamped drawings where required.

06

Interior Renovation Permit

Interior Renovations That DO Require a Permit

  • Removing or altering load-bearing walls
  • Changing the layout or structure of a space
  • Adding or modifying plumbing fixtures (kitchens, bathrooms)
  • Updating or installing HVAC systems
  • Finishing or converting a basement
  • Creating a secondary suite or rental unit
  • Renovating a commercial interior space

Interior Renovations That do NOT Require a Permit

  • Cosmetic updates (painting, flooring, cabinetry)
  • Replacing fixtures without moving plumbing
  • Minor repairs that don’t affect the structure or systems

If you’re unsure, this is where we help. We’ll review your project and tell you exactly what’s required before you start. Interior renovation permits are commonly required when the work changes structure, layout, plumbing, HVAC, fire separations, exits, or commercial occupancy conditions. Cosmetic work such as painting, flooring, and cabinet replacement may not require a permit if no regulated building systems are changed, but the scope should be confirmed before construction begins.

With the right engineering and permit team, the interior Renovation process can be smoother, faster, and more predictable.

Interior Renovation Permit Design

Interior Renovation

Plan Before You Renovate

Interior Renovation Permit Considerations

Residential Renovation

Typical Examples

Basement finishing, wall removal, bathroom or layout changes

Key Permit Considerations

Structure, plumbing, HVAC, egress & fire separation

Commercial Renovation

Typical Examples

Office, restaurant, retail, clinic & unit fit outs

Key Permit Considerations

Occupancy, life safety, accessibility, washrooms & ventilation

Cosmetic Renovation

Typical Examples

Painting, flooring, cabinets & trim

Key Permit Considerations

Often permit-exempt when no structural or regulated systems are changed